Friday, 29 November 2013

Typography for Our CD Digipack


These are the possible fonts for our digipack


 




Album Cover Brainstorming



This is the first rough CD design, which will undoubtedly be re-produced and changed over time

Evaluation of Shooting Day


First of all our group gathered together and we went to the location  where we were going  to shoot our music video. We discussed any issues that might occur. We talked through our props, lightening, the background and thought of any other interesting ideas which we could imagine. Afterwards me and Anna went to IT department to ask for the projector, so we won’t worry about it on the shoot day. Basically our aim was to fully prepare for the shoot day and therefore run it as smooth as possible
One might say that the feeling were incredible, being excited and intrigued , but honestly since knowing that everything is prepared and the issues were illuminated I woke up in a calm manner without the sense of urgency
In the morning we went to the studio and waited for all the cast members to arrive. Once they came we briefly showed them how our music video would look like and which other music videos are similar to our one. We also checked whether they were wearing what we asked them on the previous day, since it was really important for their cloths to match our music genre.

As already said, we have worked really hard for the preparation of the set, which made our life much easier on the actual shoot day. The preparation involved as I said already taking the projector from IT and also gluing the walls and sticking wallpaper. Afterwards we coloured the walls from white to black to make a contrast and also had tube lights forming a triangle making the video to appear more creative
All our members of the group worked really hard doing our best to achieve what we want. Since I did drama and achieved a very high score, it was personally easier for me to work with our actors helping them with their body language, facial expressions and picking on what they shouldn’t do in front of camera. I also worked with directing the music, making it slower or faster and helping the drummer to match with the beat
In my opinion, having the drama skills allowed me to achieve exactly what I wanted from our actors. Helping them how to move, making them look more confident and eventually feel infused with the song itself

I don’t think we have any significant problems, as we spent a fairly long time organizing and preparing for the day. Maybe the only issues was not letting the teachers of our singer know about him being involved in a shoot day
That’s the question which I think will have similar answers, since our slow-motion part of the music video was amazing. All of us really enjoyed that part. The slow-motion required for our band members to play twice faster, which was quite difficult, but luckily having the energy
and enthusiasm they achieved the task
The only issue which I was concern of was that our guitarist on the right hand side by persistently covered by singer, which did not allow him to fully play his role. The position was a little bit distorted and we should have moved our band slightly to the left, however it is not a major problem at all and we are still totally happy
We were carefully choosing our cast members, since it was important for us to have actors who have the ability to perform and play their instruments. We also gave them to listen the whole week to our music for them to get used, so it would be easier on the actual shoot day. During the process and at the end of the day we were absolutely amazed with their talent and ability. The friendly atmosphere which the band members created was really pleasant. They helped each other and corporate, since they also wanted for the music video to look good. At the end of the day all of us were really satisfied and happy
The part which I am mostly excited to see is the slow-motion part, since I really liked the concept of it. It looked really unnatural and unusual which makes it appear unique
We perfectly worked together, without having any arguments or disagreements, but harmony and respect
There are undoubtedly a lot to learn from, such as understanding more in-depth how actors work and what gives them the drive and the motion. Moreover it developed our imagination, since we had to think of different ideas which we could apply for our music video. Personally I think that everything went as we wanted and there would be no changes applied.
To sum it all up we really worked hard from the beginning when we were just brainstorming ideas to the shoot day where we also had to put our effort. We were really lucky with our cast members as they had the same willingness to make the music video look nice. We had a fair division of labour, thus making our task easier. And eventually all of us were happy after the shoot day, since the effort and the hard work were worth it

Wednesday, 13 November 2013

Album Cover

Our aim was for make a simple, but unique album cover. The photographs used would be pictures of our band, the set, or the location. The remaining aim is to have the face of the soloist in a framed portrait covering half of the face with the box



Thursday, 7 November 2013

Props and Costumes


Props And Costume List: ‘Flawless’

 

Guitarist
Quantity
Black Jeans
1
Tank top
1
Boots Short black leather lace up boots
Timberland/dc martins
1
Ear cuff
1
Drummer
Quantity
White T-shirt with picture
1
Black blue trousers
1
Classical black shoes
1
Necklace
3
Ring
1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



Props And Costume List: ‘Flawless’

Singer
Quantity
Blue shirt with collar
1
Blue trousers
1
Converse
1
Bracelets
3
Ring
2
Ear Cuffs
2
Jacket
1

 

Bassist
Quantity
Grey Jumper
1
Grey trousers
1
Ring
2
Thin metal bracelet
1
Thick Necklace
1
Dr Martin boots.
1

 

 

 

Projection Dancer
Quantity
No shirt
 
Blue ripped jeans
1
Blue snake belt
1
Blue converse shoes
1
White short socks
1

 

Dancer
Quantity
Leotard
1
Black tights
1
Ballet shoes
1
Fabric
3 metres

 



 
 
 



Instruments
Quantity
Guitar
1
Bass
1
Drums
1
Microphone
1
Strip lights
6
Smoke machine
1

 

 

 

 



 

Wednesday, 6 November 2013

Our CD Cover

 
 
 After thinking for a while we came to the decision that our album will look similar to this one. We have been inspired by number of different CD covers of variety of similar to our genre bands. The aim is to attract audience, therefore we will try to produce a creative one.




 
 
 

Personally I have been inspired by albums covers where you could see all members of the band, showing the importance of each of them, but putting forward the solist. Specifically this one, where you can see the faces of the members behind, while their body is mixed with the dark colour and having the solist in the front with a different colour of cloths, highlighting him as being the key member of the band.





Friday, 1 November 2013

Our Shooting Schedule






Time

Shot no.

Shot Description

Actors

Props

Phone Numbers

9:00 – 9:45

1

Wide shot of set, with band playing  - play through song

Mike Asaturov, Maksym Kulik, Alex Wadstein, George Hill, + singer

Drums, guitar, bass, microphone, smoke machine, lights, blinders

 

 

2

Close up of lead singer (sing through song)

 

Microphone

 

 

3

Close up of guitarist (30 seconds

Mike Asaturov

Guitar

 

 

4

Close up of drummer (30 seconds)

Alex Wadstein

Drums

 

 

5

Close up of bassist (30 seconds)

George Hill

Bass

07952683551

9:45 – 10:20

6

Medium shot of lead singer (15 seconds)

 

Microphone

 

 

7

Medium shot of guitarist (15 seconds)

Mike Asaturov

Guitar

 

 

8

Medium shot of drummer (15 seconds)

Alex Wadstein

Drums

 

 

9

Medium shot of bassist (15 seconds)

George Hill

Bass

 

10:20 – 10: 35

 

BREAK

 

 

 

10:35 – 11:00

11

Extreme CU of strumming/fretboard

Mike Asaturov

Guitar

 

 

12

Extreme CU of mouth singing

Singer

 

 

 

13

Extreme CU of foot on drum pedal

Alex Wadstein

Drums

 

 

14

Side medium shot of bass

George Hill

Bass

 

 

15

Panning wide shot on set and lights

Band members

Lights, instruments, set

 

11:00 – 12:00

16

Mid shot of band standing in a line relaxed on set

Band members

 

 

 

17

Panning WS on band standing

Band members

 

 

 

18

WS of band leaning/sitting around on set

Band members

Instruments

 

 

19

H/A on band lying down around the set

Band members

Instruments

 

 

20

CU of feet walking away

Band members

 

 

 

21

Over the shoulder shot of band

Band members

Instruments

 

12:00 – 12:30

22

Wide shot of dancer with projections

Maksym Kulik

Projector, filters, smoke machine, lights

 

12:30 – 1: 10

 

LUNCH

 

 

 

1:15 – 2:00

24

Close up of projections

Maksym Kulik

‘’

 

 

25

Mid shot of projector moving

 

‘’

 

 

26

Close up of projection on face

Maksym Kulik

‘’

 

2:00 – 2:30

27

High angle on projection dancer

Maksym Kulik

‘’

 

 

28

Panning on projection dancer

Maksym Kulik

‘’

 

2:30 – 3:00

29

Wide shot of dancer with fabric

Delphine Lim

Fabric, lights, smoke machine

 

 

30

Mid shot from behind the lights on fabric dancer

Delphine Lim

‘’

 

 

31

Close up of her face behind fabric

Delphine Lim

‘’

 

 

32

Mid shot of dancer legs + fabric

Delphine Lim

‘’

 

3:00 – 4:00

33

Mid shot of upper body + fabric

Delphine Lim

‘’

 

 

34

Shot of lights

 

Lights

 

 

35

Panning on wallpaper

 

Set

 

 

36

Close up of smoke

 

Smoke machine

 

4:00 – 4:30

37

Close up of fabric

 

 

 

 

38

Shot of blinders turning on

 

Blinders

 

 

39

Panning mid shot of set

 

Set, instruments, lights, smoke machine

 

4:30 – 5:30

40

CU of smoke, light and lead singer

Lead singer

Smoke machine, lights

 

 

41

WS of band with light chair

Band members

Chair, lights, smoke, set

 

 

42

WS of band with light chair

Band members

-1

Set, lights, smoke machine

 

 

43

WS of band with light chair

Band members

-2

Set, lights, smoke machine

 

 

44

WS of band with light chair

Band members

-3

Set, lights, smoke machine

 

 

45

WS of singer with light chair

Lead singer

Set,

lights, smoke machine

 

5:30 – 6:30

46

Additional Shots